Surgery & PACU Expansion

Surgery PACU Operating Room
Surgery PACU Nurse Station
Surgery PACU Nurse Station 2
Surgery PACU Patient Position
Surgery PACU Floor Plan

Surgery & PACU Expansion

 

The St. Vincent Surgery improvements project includes two state of the art Cardiac Surgical Suites. A Neurosurgical Suite, a 17 bed Recovery Room, significant HVAC and infrastructure upgrades and numerous small support upgrades.  This project was built in two concurrent phases so that it could be accomplished in a minimal amount of time. Each phase of the project was ultimately designed, reviewed and approved, constructed, licensed and occupied in 9 and 11 months.  Under a normally aggressive schedule it should have taken 24 months.

Project Objectives:

  • Work with the Client, OSHPD and General Contractor to  minimize the construction time.
  • Create the finest, most sophisticated Heart and Neuro Rooms possible.
  • Create out of substandard space with structural clearances ranging between 7’6” to 10’6” a 17 bed recovery unit.
  • Eliminate as much of the clutter and chaos that accompany operating and recovery rooms.
  • Integrate new technology.